Methodology
Formula & assumptions
Treatment surface
surface length × surface height
Defines the physical wall or ceiling field.
Selected treatment area
surface area × selected coverage percentage
Uses the coverage target you provide.
Panel count target
treatment area × (1 + allowance) ÷ panel face area
Adds visible spare/layout reserve.
Whole boxes
panel count ÷ panels per box, rounded up
Rounds at the selected package boundary.