Methodology
Formula & planning assumptions
Patch volume
patch area × average depth ÷ 12
Converts the measured patch field to cubic feet.
Target volume
base volume × (1 + allowance %)
Adds the entered reserve.
Packages
ceiling(target ÷ package yield)
Rounds to whole packages.
Field verification
compare calculated quantity with measured scope and current product/stock values
Confirms the takeoff boundary before purchase or layout marks are transferred.