Methodology
Formula & planning assumptions
Base membrane area
eave length × eave depth + valley length × valley width + extra area
Keeps project detail areas explicit.
Target area
base area × (1 + allowance %)
Adds overlap and cut allowance.
Rolls
ceiling(target area ÷ roll face area)
Uses entered roll dimensions.
Field verification
compare calculated quantity with measured scope and current product/stock values
Confirms the takeoff boundary before purchase or layout marks are transferred.