Methodology
Formula & planning assumptions
Precipitation rate
96.3 × zone GPM ÷ irrigated area
Unit conversion to inches per hour.
Runtime reference
target depth ÷ precipitation rate × 60
Minutes at the calculated average rate.
Planning allowance
base quantity × (1 + entered allowance %)
Keeps waste, overlap or reserve explicit instead of hiding it in the base geometry.
Field verification
compare calculated quantity with measured scope and current product/stock values
Confirms the takeoff boundary before purchase or layout marks are transferred.