Methodology
Formula & planning assumptions
Tape per opening
vertical runs × opening height + horizontal runs × opening width + detail tape
Keeps the installation sequence user-defined.
Purchase target
base tape × (1 + allowance %)
Adds overlap, cuts and patch allowance.
Rolls
ceiling(purchase target ÷ roll length)
Rounds to full rolls.
Field verification
compare calculated quantity with measured scope and current product/stock values
Confirms the takeoff boundary before purchase or layout marks are transferred.