Quick answer
Use the same datum for every station, copy planned elevations from the calculator and record measured elevations without replacing the original target.
Field verification
Drainage Grade Station Field Log
Linking is browser-local. Field Packet 2.0 can include this worksheet only when you explicitly link it to a project.
| Station | Distance | Planned elevation | Measured elevation | Measured − planned | Target slope | Datum / benchmark | Notes | Row action |
|---|---|---|---|---|---|---|---|---|