Roofing project workflow
Replace a Roof
Measure roof planes and linear features, calculate roofing quantities, preserve pitch and accessory evidence, compare entered quotes, purchase materials and reconcile field use without making code or structural decisions.
Project knowledge graph
Keep each project decision connected to the evidence that owns it.
MEASURE → CALCULATE → PLAN → PRICE → BUY → BUILD → RECORD. The workflow links these steps without merging unlike quantities or rewriting the original measurement.
Browser-local progress
Work through 9 steps at your own pace.
Checking a step only records progress in this browser. It does not assert that work was inspected, code-compliant or professionally completed.
Stage 1
Measure
Preserve roof-plane geometry and linear features before ordering.
Measure roof planes from a plan or image
OptionalEvidence presentKeeps calibrated roof geometry browser-local and auditable.
Open takeoff →Organize planes, pitch and roof features
Evidence presentSeparates plane area from ridge, hip, valley, eave and rake lengths.
Open planner →Verify roof area
Evidence presentCross-checks the pitch/area basis used for material planning.
Open tool →
Stage 2
Calculate materials
Keep field material groups separate and source-backed.
Estimate roofing material
Evidence presentPlans the primary roof covering from explicit geometry and coverage assumptions.
Open tool →Plan ridge cap
OptionalEvidence presentKeeps ridge/hip linear footage separate from field roofing area.
Open tool →
Stage 3
Estimate, buy & reconcile
Move quantities into entered quotes and actual purchasing evidence.
Build an entered-rate estimate
Evidence presentCompares project quantities with rates and quotes supplied by the user.
Open planner →Track orders and receiving
Evidence presentPreserves planned, ordered and received quantities.
Open planner →Carry a roofing takeoff worksheet
Evidence presentProvides a field-ready paper record of the quantity basis.
Open printable →