Bathroom finish workflow

Tile a Bathroom

Measure wet-area surfaces, calculate field tile, niche tile, grout and trim, then compare package options and close the project with a punch list.

All workflows

Browser-local progress

Work through 9 steps at your own pace.

Checking a step only records progress in this browser. It does not assert that work was inspected, code-compliant or professionally completed.

0 / 9 complete

Stage 1

Measure

Separate each tiled surface before combining material needs.

  1. Save bathroom measurements

    Keeps wall/floor dimensions reusable while special surfaces remain explicit.

    Open measurement →
  2. Estimate shower wall tile

    Calculates the main shower tile area from entered surfaces.

    Open tool →
  3. Measure niche tile surfaces

    Keeps niche faces separate from the main wall quantity.

    Open tool →

Stage 2

Calculate

Finish the material takeoff around the tile field.

  1. Estimate grout

    Uses the entered tile/joint basis rather than assuming a universal rate.

    Open tool →
  2. Estimate tile trim

    Plans the selected exposed-edge trim stock while keeping product profile and installation details explicit.

    Open tool →
  3. Estimate shower wall board

    Optional

    Useful when the project scope includes new board; manufacturer wet-area requirements remain external.

    Open tool →

Stage 3

Buy & close

Keep option comparison and closeout organized.

  1. Compare tile/package options

    Keeps package coverage and project cost on the same basis.

    Open printable →
  2. Check tile deliveries

    Records quantity and visible issues before setting material.

    Open printable →
  3. Close out the finish work

    Creates a visible list of incomplete or correction items.

    Open printable →