Methodology
Formula & assumptions
One-run volume
length × width × depth
Width/depth converted to feet internally.
Repeated runs
one-run volume × quantity
For equal rectangular footings only.
Planned volume
base volume × (1 + extra %)
Adds placement contingency.
Premix bags
ceil(volume ÷ bag yield)
Uses reference yields of 0.60 and 0.45 ft³.