Slabs, walls & form runs
Concrete Takeoff Studio
Measure slab/footing areas and form runs from a drawing before thickness, volume, bag and reinforcement planning.
1 · Plan sheets
Load image or PDF sheets locally
PNG, JPG, WebP or PDF. Files stay in this browser session; saved geometry does not contain the uploaded source file.
2 · Calibration
Set scale from a known dimension
Enter the real distance, choose Calibrate, then click the two endpoints of that dimension on the plan.
Not calibrated
3 · Measure
Trace length, area or count repeated items
Every measurement remains editable evidence. Product coverage, waste, pitch, structural rules and installation decisions are intentionally downstream.
Upload a plan or use the blank grid, then calibrate before measuring.
4 · Evidence
Measured takeoff
Totals stay separated by length, area and count. Count points do not require scale calibration.