Methodology
Formula & assumptions
Selected shape volume
shape-specific measured geometry
Slab/rectangular section = L × W × thickness; round column = πr²h; post hole = gross cylinder − round-post displacement; solid steps = stacked rectangular layers.
Project base volume
one measured shape × identical quantity
Use quantity only when the selected shapes/runs truly share the same dimensions.
Planning volume
base volume × (1 + extra allowance %)
Allowance is explicit and applied after measured geometry.
Bulk order reference
planning cubic feet ÷ 27
There are 27 cubic feet in one cubic yard.
Premix bag reference
ceil(planning cubic feet ÷ package yield)
HML shows both cited QUIKRETE Concrete Mix examples and an editable selected-product yield. Verify the exact product label.