Methodology
Formula & assumptions
Measured base volume
slab length × slab width × compacted base depth
Models only the entered aggregate layer beneath the slab.
Placement target
measured base × (1 + allowance)
Reserve stays visible instead of inflating slab dimensions.
Bulk order volume
target cubic feet ÷ 27
Use supplier density when ordering by weight rather than volume.
Bag quantity
target ÷ entered bag yield, rounded up
Use the actual usable yield printed for the selected product.