Methodology
Formula & assumptions
Measured run
entered fascia run
Trace the actual eave/rake edges in the replacement or installation scope.
Net run
measured run − excluded sections
Use exclusions for areas not being replaced or not receiving fascia.
Planning target
net run × (1 + entered allowance)
Keep cut/defect reserve separate from the measured line.
Stock pieces
planning target ÷ board length, rounded up
Review long-run joint constraints after the pure-footage result.