Methodology
Formula & planning assumptions
Molding per frame
2 × (frame width + frame height)
Rectangle perimeter.
Target footage
per-frame perimeter × count × (1 + allowance %)
Adds miter/cut reserve.
Stock pieces
ceiling(target ÷ stock length)
Reference before detailed cut optimization.
Field verification
compare calculated quantity with measured scope and current product/stock values
Confirms the takeoff boundary before purchase or layout marks are transferred.