How to measure this project
Measure the actual developed horizontal run between the two points whose elevation difference you want to check. Do not use a diagonal tape distance when the design slope is defined against horizontal run. Record the starting elevation and planned endpoint independently so the calculated drop can be checked against real site constraints rather than accepted in isolation.
Before you buy materials
Enter only a slope that has already been selected from the project design, manufacturer instructions or applicable plumbing requirements. Different pipe uses, diameters and jurisdictions can require different minimum or maximum conditions. This calculator is intentionally limited to geometry; it does not approve a drainage layout, venting scheme, trap arrangement or pipe size.