Project workflow
Treat routing and hydraulic design as separate layers
Measure developed routes
Pipe and tubing quantity follows the actual framing or trench path, not a straight-line shortcut.
Enter design values rather than inventing them
Slope, diameter and system layout must come from the project design or applicable requirements.
Round material only at stock boundaries
After measured run or volume is established, convert to coils, pipe sections or bulk aggregate units.