Methodology
Formula & assumptions
Measured basis
measured dimensions → project geometry
Start from dimensions that can be traced to the physical project.
Net quantity
gross geometry − known exclusions
Subtract only exclusions that are actually outside the material scope.
Planning target
net quantity × (1 + entered allowance)
Keep waste, overlap or handling reserve separate from geometry.
Purchase quantity
planning target ÷ entered package / stock coverage
Round up only at the supplier package or stock boundary.