How to measure this project
Measure horizontal run on plan or with a level reference, then measure the vertical change between the same start and end points. Do not substitute the sloped surface length for horizontal run; that changes the percentage and angle. On uneven ground, divide the route into segments if the grade changes materially and preserve the direction of fall on a sketch.
Before you buy materials
Use the result as a conversion between equivalent ways to describe measured slope. The calculator does not decide whether the grade is suitable for drainage, accessibility, roofing, retaining walls or any other system. Those requirements can depend on code, manufacturer instructions, soil, surface finish and project design. If you need material length along the slope, the sloped-length output can be carried into the relevant stock calculator.