Drainage takeoff workflow

Improve Yard Drainage

Measure the proposed drainage run, estimate excavation, pipe, bedding, fabric, backfill and dry-well stone quantities while keeping slope/design decisions explicit.

All workflows

Browser-local progress

Work through 10 steps at your own pace.

Checking a step only records progress in this browser. It does not assert that work was inspected, code-compliant or professionally completed.

0 / 10 complete

Stage 1

Measure & define

Capture the run and project-selected geometry without pretending to design drainage.

  1. Save the drainage run

    Stores the proposed drainage run length and project notes for reuse without deciding the drainage design itself.

    Open measurement →
  2. Estimate drain pipe length

    Adds the allowance you enter to the measured run.

    Open tool →
  3. Check entered pipe slope

    Optional

    Translates rise/drop and run; required slope remains a design/code decision.

    Open tool →

Stage 2

Calculate

Turn the selected trench geometry into material quantities.

  1. Estimate trench excavation

    Calculates excavation volume from entered trench dimensions.

    Open tool →
  2. Estimate pipe bedding

    Plans the selected bedding depth and trench width.

    Open tool →
  3. Estimate drainage fabric

    Plans fabric area from the selected trench wrap/layout.

    Open tool →
  4. Estimate trench backfill

    Accounts for entered displacement and selected backfill basis.

    Open tool →
  5. Estimate dry-well stone

    Optional

    Useful when the chosen outlet includes a dry well; suitability remains external.

    Open tool →

Stage 3

Buy & document

Preserve assumptions before purchasing or excavation.

  1. Write the project scope

    Records what is included, excluded and still requires verification.

    Open printable →
  2. Prepare the material list

    Keeps pipe, bedding, fabric and backfill quantities on one record.

    Open printable →